Infrastructure of the Neighborhood 1 – Aquadelta condominium

Beginning:

November/2024

End:

November/2025

Short Description:

Stormwater, sewage and running water drainage works, internal roads with asphalt paving and construction of a 2,500 m long perimeter canal

Contractor:

River Landscapes