LPI ANDE No. 1596/2020 - Construction and Interconnection Project of the María Auxiliadora Substation, within the framework of the Project to Strengthen the Transmission of the National Interconnected System (SIN) and Rural Electricity Distribution (CAF V), financed by the Development Bank of Latin America (CAF)

Contract No: 8365/2021 - Lot 2

Beginning:

28/02/2024

End:

28/05/2025

Brief Description:

Executive Project, Supply of materials and Construction of the Transmission Line LT-220 kV SRI-MAU. The María Auxiliadora and Santa Rita Substations can be interconnected through this project, the length of the Line is 89 km and will have a double ACAR conductor of 950 MCM per phase.

Contractor:

National Electricity Administration (A.N.D.E.)