Execution of Paving Works for Loma Plata – Filadelfia Section.

Beginning Construction:

January/2021

End Construction:

March/2022

Description:

The works consist in the asphalt paving of the road section between Loma Plata and Filadelfia cities, with a total length of 21.19 km. It consists of two lanes, 3.25 m wide each, with shoulders 2.00 m wide on each side. The main construction items were embankment, reinforcement of subgrade, soil-cement subbase, crushed stone base course, 5 cm thick asphalt course, reinforced concrete box culverts.

Contractor:

M.O.P.C.