20 months
The project consists of the construction of a fiber-reinforced concrete pavement. The works will be executed over a previously prepared subgrade, strictly following the horizontal and vertical alignments, elevations, cross-sections, and pavement thicknesses as specified in the technical documentation and design drawings.
MOPC
Consorcio Avanza Chaco